|
Cristian ROMAN
cris@europe.com Cell:
40721578256 |
|
|
36 Dumbrava Noua str., Bl. P 25, Ap. 34 Bucharest 5 , 051154, ROMANIA |
Education
State
Inspectorate in Constructions, Bucharest
Site Inspector – November 2007-Site
Inspector permit No. 00001425 for the fields : Products for constructions,
obtained, as a result of the examen passed on the 2007/11/21
State Inspectorate in Constructions,
Site Inspector – October 2006-Site Inspector permit for the fields: Civil, industrial and agrozootechnical buildings, obtained as a result of the examen passed on the 2006/10/16
State Inspectorate in Constructions, Bucharest
Quality Inspector (CQ) - June 2003
“Quality Inspector” permit for the fields: Civil, industrial, agrozootechnical and surface mining buildings, obtained on the 2003/6/20, as a result of the examen passed on the 2003/6/4, reauthorized on the 2005/6/24, as a result of the examen passed on the 2005/6/22 and reauthorized in June 2007, as a result of the examen passed on the 2007/6/21
The Mayoralty of the Sector 5, Bucharest
Authorised Physical Person - June 2003
“Authorised Physical Person”, for activities of engineering and consultancy, in accordance with the Permit obtained on the 2003/9/6
NATIONAL CONSERVATORY OF ARTS AND TRADE, PARIS
Executive Master of Business Administration (EMBA) - July 2002
E.M.B.A.–Conservatoire National des Arts et Metiers (National Conservatory of Arts and Trade) Paris, 2000/2002, graduated with Examen (Mark 16/20) and Diploma
BABES-BALYAI UNIVERSITY, Cluj-Napoca
FACULTY OF EUROPEAN STUDIES 2000/2001, distance learning courses (2000/10/1-2001/3/31)
PRO MANAGEMENT INSTITUTE, Bucharest - December 1999
1999/10/23-1999/12/4 PRO MANAGEMENT INSTITUTE-Bucharest-Intensive Management and Marketing courses-graduated with Examen (Mark 10/10) and Diploma
HYPERION UNIVERSITY, Bucharest
FACULTY OF LAW 1997/1998, courses without attendance (1997/10/1-1998/6/15)
THE TECHNICAL UNIVERSITY OF CONSTRUCTIONS, Bucharest - July 1982
THE FACULTY OF CIVIL, INDUSTRIAL AND AGRICULTURAL CONSTRUCTIONS, 1977/1982, graduated in 1982 with Licence Diploma of Construct Engineering Degree (Mark 10/10)
National Tourism Agency, Bucharest
Traveller’s guide for french, english and german - March 1978
Traveller's guide courses for French, English and German languages (1977/12/15-1978/3/15) graduated with final examination
The “N. Balcescu” Club, Sector 5, Bucharest
Shorthand writer - September 1977
Shorthand courses, Taylor-Mihaila Method (1977/5/16-1977/9/20), graduated on the 1977/9/20, with final examination and Diploma
THE NATIONAL COLLEGE GOETHE, Bucharest - June 1976
1972/1976 The National College Goethe (ex Theoretical “Hermann Oberth” # 21 Secondary School) Bucharest (with German Teaching Language) graduated in 1976 with school-leaving examination and Diploma
PROFESSIONAL
Experience
full time activities
SOUTH PACIFIC
CONSTRUCTII, Bucharest, ROMANIA -2008, February 1 to present
Senior Project Manager - Baneasa – Straulesti Residential Area – 241
dwellings, on 3.3 ha (Euro 12,000,000 value) 58-60 Straulesti Road, Bucharest -
Beneficiary : Ministry of National Defense & Sydney Residence – 112 villas,
on 2.6 ha (Euro 11,000,000 value) Tunari, Ilfov District - Beneficiary : South
Pacific Group and drawing up of the Environmental Management System
Documentation for the SR EN ISO 14001:2005 Certification (6 tomes - 309 pages)
& of the Occupational Health & Safety Management System Documentation
for the SR OHSAS 18001:2004 Certification (5 tomes - 154 pages)
BOVIS LEND
LEASE INTERNATIONAL LIMITED, London, UNITED KINGDOM & Bucharest
2006,
August 29 to 2008 January 31 – Project Manager (March 1-September 9,
2007) & Site Inspector (May 10,
2007-present) Melbourne Residence – 71 dwellings Tunari, Ilfov District -
Beneficiary : South Pacific Group & Project Manager (March 1-May 31,
2007 & September 10-present) Baneasa – Straulesti Residential Area – 241
dwellings 58-60 Straulesti Road, Bucharest - Beneficiary : Ministry of National
Defense ; Construction Manager (December 1, 2006-February 28, 2007) & Assistant Project Manager (August
29-November 30, 2006) Baneasa – Straulesti Residential Area – 241 dwellings
58-60 Straulesti Road, Bucharest - Beneficiary : Ministry of National Defense
SERACOM
INTERNATIONAL GROUP, Brussels, BELGIUM & Bucharest - 4/3 to 2006/6/26
General Manager - Organization and monitoring of the activity of the company ;
Drawing up of the Handbook of the Quality of SERACOM Company (Revision 0-8
tomes-966 pages and Revision 1-8 tomes-1020 pages) and started the formalities
of ISO 9001: 2000 certification with TÜV; Drawing up of the Quality Program for
the Building site “Billa Supermarket Billa-Baia Mare” (1 tome-242 pages);
Drawing up of the Jobs’ Cards for the 45 employees (1 tome-245 pages); Setting
up of the 3 D Projection 3D and Data Bases Administration Department (hired 3
Engineers and 1 Architect); Monitoring of the activity of the building sites:
Construction of the Logisitics Center from Avlona, Attica, Greece (Beneficiary:
Michelin), Modernization of the Logisitics Center from Davydovo, Russia
(Beneficiary: Michelin), Supermarket Billa Baia Mare
WORLDBANK-Romanian Social Development Fund, Bucharest -2003, December 2-2005, June 7
Councellor - Monitor (Project Manager)
Tasks : coordinating and monitoring of 33 projects in 5 counties with 13 engineers-appraisers-supervisors (Rehabilitation of 2 Community Houses-500 s.m.; Local water supply of 7 localities-31.86 km; Rural road rehabilitation 24 localities-69.72 km) (Budget managed : 2,380,000 $)
WORLDBANK-Romanian
Social Development Fund, Bucharest-2003, June 9-2003, December 1
Consultant - Appraiser / Supervisor - Tasks: Desk and field
appraisals
ROMAN TREI CONSTRUCT-COM, Bucharest - 1994, December 23 - 2005, April 30
General Manager
Tasks: Bucharest Financial Plazza (The New Central Residence of the Ex-Bancorex Bank) & Eurocenter Bucharest (The Headquarters of the External Informations Agency) (Speciality Subcontractor of the French Company Bouygues–General Contractor) (maximum personnel, including technical & administrative staff : 210 people)
C.R.I.S.T.I./MOND, Bucharest - 1993, August 15 - 1994, December 22
Commercial Manager
Tasks: Hotel Sofitel, World Trade Center Bucharest & World Trade Village "Le Club" (Speciality Subcontractor of the French Company Bouygues–General Contractor)
ATLAS 2001 IMPEX (ROMANIA) & RADMER BAU, A.G. (GERMANY), Industrial City Louisenthal, Gmund am Tegernsee, Bayern, GERMANY
Chief of the Site – 1993, January 10 - 1993, August 14
Task: Construction of an industrial (unique & complex) building (Paperplant)
I.T.E.K./International Technic’s Keeper, Agadir - 1991, July 2 - 1992, December 29
Workroom Chief
Tasks: Technical control of the sites: Smara (Occidental Sahara), Agadir, Dcheira, Nador, Inezgane, Taroudant
El Allali Ahmed Architecture’s Office, Agadir - 1990, February 23 - 1991, July 1 - Workroom Chief
Tasks: Technical control of the sites: Agadir, Ait Melloul, Ouarzazate, Ouled Teima, Rabat, Tata
Bucharest’s Municipality / A.F.I. (Administration of the Imobil
Fund)
-
Site Inspector - 1987, June 19 - 1990, February 22
Tasks: Technical control of the
constructions: 17 Block of flats in the 2nd Civic Centre, Marasesti
Ensemble
Company of Constructions
Tasks: Output basis
Conintex (A.C.M. 6) (Enterprise of Constructions Erection)
Bucharest
Beginner Engineer - 1983, July 1 - 1985, August 6 and Chief of the Site - 1985,
August 7 - 1986, March 31
Tasks: Civil Constructions Balotesti and Peris, District of Ilfov
A.F.I. Bucharest (Administration of the Imobil Fund) - I.C.R.A.L. Ilfov (
Beginner Engineer - Tasks: Civil Constructions Buftea, District of
Ilfov
G.S.C.I.P. Bucharest (Group of mineral oil Sites, Constructions and Installations)
Beginner
Engineer-1982, August 7 - 1982, October 22;
Task: Industrial Construction Videle, District of Teleorman
part-time (co-operation) activities (as
quality controller)
SUMMA ROMANIA, Bucharest, ROMANIA–2008, June 1 to
present– Quality Controller – Quality
control of the works for the Site “Monaco Towers Project-Towers A+B : 2
Basements+Groundfloor+M+20Floors”-94 Berceni Road, Bucharest 4
TERRATEST GEOTEHNIC, Bucharest, ROMANIA–2008, February 22 to
present– Quality Manager &
Managerial Consultant – Quality control of the works and the drawing up of
the Quality Program for the Site “Condominium Tei Residential Project”-28 buildings (3 of Basement+Ground Floor+10 Floors,
12 of Basement+Ground Floor+4 Floors & 13 Basement+Ground Floor+5
Floors)-504 dwellings+ covered swimming pool, 3 tennis fields, Commercial
Centre, kindergarden & a green zone-58.000 m2-total area, 11-13
Chefalului Str., Bucharest 2
EDRASIS CONSTRUCT
GRUP, Bucharest - 2008, January 7 to
present – Managerial Consultant & Quality Controller (CQ) - Drawing
up of Company Quality Management System Documentation for the SR EN ISO
9001:2001 Certification (10 tomes - 950 pages), the Environmental Management
System Documentation for the SR EN ISO 14001:2005 Certification (6 tomes - 310
pages), the Occupational Health & Safety Management System Documentation
for the SR OHSAS 18001:2004 Certification (5 tomes - 156 pages), quality
control of the works and the drawing up of the Quality Programs for the Sites :
“RESIDENTIAL BUILDING”- 108-112 Mihai Eminescu str., Bucharest 2 ; “BLOCK OF
FLATS”- 2Basements+Ground floor+5 Floors, 16-18 Mihai Moxa str., Bucharest 1 ;
“MACDONALD’S BILLA”-102-104 Barbu Vacarescu str., Bucharest ; “COLLECTIVE
DWELLINGS”-Basement + Ground Floor+5 Floors-22-24 Acvila str., Bucharest 5 ;
“AVRIG OFFICE BUILDING”-1-7 Avrig str., Bucharest ; “IASI PALACE”-Dwellings
Project-1A Stefan the Great & Holy Square, Iasi ; “DWELLINGS BUILDING”-65-67
Mihai Eminescu str., Bucharest 2 ; “PLAZZA ROMANIA-EXTENSION”-26 Timisoara
Blvd., Bucharest 6 ; “DWELLINGS BUILDING Basement+Half-Basement+Ground
Floor+2Floors+3rd Retired”-132-138 Straulesti Road, Bucharest 1
SIMGE INSAAT,
Bucharest - 2007, December 15 to
present - Consultant & Quality Controller (CQ) Quality control of
the works and the drawing up of the Quality Programs for the Site “Residential
Project FELICITY”-4 Blocks of Flats Basement+GF+2 floors+Attic Floor, 1-43
Opalului Road, Bucharest 1
TOSUN GROUP
CONSTRUCT, Bucharest - 2007/12/15 to 2008/6/27
- Consultant & Quality Controller (CQ) Quality control of the works
and the drawing up of the Quality Programs for the Sites "Logistic Centre
Aquila – Halls for Ware Stock and Offices"-Pantelimon City, Ilfov
District, “Offices Buildings and dwellings – 2 corps C + D”-Basement+GF+4
floors + Technical Floor, 5-9 Jandarmeriei str., Bucharest & “Residential
Project FELICITY”-4 Blocks of Flats Basement+GF+2 floors+Attic Floor, 1-43 Opalului
Road, Bucharest 1
SARIDEN
CONSTRUCT, Bucharest - 2007, November 26 to
December 3 - Quality Controller (CQ) Drawing up of the Quality Program for the Site "Athos
Residential Project"-2 Block of Flats - Basement + Ground Floor+8 Floors-71 Danube Blvd.,
Voluntari, District of Ilfov
PRO EURO
CONSTRUCT, Bucharest, - 2007, October 15 to
December 14 - Quality Controller (CQ) - Quality control of the works for
the Site "Dwelings Project", 3-11 Ion Agarbiceanu Alley, Bucharest
MEZANA INSAAT
SANAYI VE DIS TICARET LTD. STI TURKEY, ROMANIA BRANCH, Bucharest-2007/8/15 to 2008/3/14-Consultant
& Quality Controller (CQ)-Quality control of the works & the
drawing up of the Quality Program for the Sites"Onix Residential
Area"&"Topaz Residential Area"-4 Padurea Neagra
str.,Bucharest
TEODORESCU
CONSTRUCT, Bucharest - 06/20/2007 to 02/29/2008
- Quality Controller (CQ) - Quality control of the works and the drawing
up of the Quality Programs for the Sites "Topaz Residential Area"-4
Padurea Neagra str., Bucharest & “Bloc of Flats”-Basement+5 floors, 45
Prelungirea Ghencea str., Bragadiru, District of Ilfov
BARBAROSSA
CONSTRUCT, Bucharest-2007/6/10 to 2008/3/9-Consultant & Quality Controller (CQ)-
Quality control of the works & the drawing up of the Quality Program for
the Site "Topaz Residential Area"-4 Padurea Neagra str., Bucharest
V.V.T.C. EURO
CONSTRUCT, Bucharest - 2007, May 1 to November
30
Consultant & Quality Controller (CQ) - Quality control of the
works and the drawing up of the Quality Program for the Site "Dwelling GF
+ Attic Floor"-81 Tarla Gura Leului str., Village Rosu, Commune Chiajna,
District Ilfov
A.P.P. CIVIL
CONSTRUCTIONS, Bucharest -
2007, April
1 to 2008 January 31 - Consultant
& Quality Controller (CQ) - Quality control of the works and the
drawing up of the Quality Program for the Site "Halls for stocks &
offices"-544 Alexandriei str., Km. 14, Commune of Bragadiru, District
Ilfov
B & A
CONSTRUCTIONS, Bucharest -
2007,
February 12 to 2007, July 15 - Quality
Controller (CQ) - Quality control of the works and the drawing up of the
Quality Program for the Site "UTI Headquarters Building"-3
Basements+Ground Floor+11 Floors-31 A Vasile Lascar str., Bucharest
EDRASIS C.
PSALLIDAS S.A. GREECE, Bucharest - 2006, September 15 to 2008 January 31 – Managerial Consultant
& Quality Controller (CQ) - Drawing up of Company Quality Management
System Documentation for the SR EN ISO 9001:2001 Certification (9 tomes - 720
pages), the Environmental Management System Documentation for the SR EN ISO
14001:2005 Certification (6 tomes - 310 pages), the Occupational Health &
Safety Management System Documentation for the SR OHSAS 18001:2004
Certification (5 tomes - 157 pages) (General Total:20 tomes=1,187 pages) +
quality control of the works and the drawing up of the Quality Programs for the
Sites : “MULTIGALAXY BUILDING”-11G Fabrica de Glucoza str., Bucharest 2 ; “DN1
ENLARGEMENT BETWEEN BANEASA AIRPORT & OTOPENI PASSAGE”-42-44 Sos.
Bucuresti-Ploiesti, Bucharest 1 ; "Cotroceni
Mall bUCHAREST"-S+P+2E-4 Vasile Milea Str., Bucharest 6 ; “ASMITA
GARDENS RESIDENCE”-168 Splaiul Unirii, Bucharest 4 ; “CEFIN-CORTINA RESIDENCE”,
83 Horia Macelariu Str., Bucharest 1 ; “BLOC OF FLATS”, S+P+5 / 6 Et., 19
Marasesti Str., Bucharest ; “METROPOLIS CENTER BUCHAREST”, 89-97 Grigore Alexandrescu
Str., Bucharest 1 ; “RECONSTRUCTIONS & COMPLETIONS IN THE BUCHAREST SEWAGE
SYSTEM-Termination of the bundle between the sewer B1 & the Boanca
gathering drain”-Bucharest ; “OFFICE BUILDING”- 2 Basements+Ground floor+6
Floors, 2-4 Gheorghe Constantinescu str., Bucharest ; “JUNE 11 RESIDENTIAL
AREA”- Basement + Ground floor +3/4 Floors, 51 June 11 str., Bucharest ;
“COMMERCIAL CENTRE SUN PLAZZA”- 391 Vacaresti str., Bucharest ; “ANCHOR PLAZZA
DOWNTOWN MALL VITAN OFFICE BUILDING”- 56-59 Vitan str., Bucharest ; “LAKEVIEW
OFFICE BUILDING”- 30 Barbu Vacarescu str., Bucharest 2 ; “UNIVERSAL
SUPERMARKET”- 2 Ion Campineanu str., Bucharest 1 ; “BIODIESEL PLANT”- Fundulea
Commune, Calarasi District ; “REHABILITATION OF NATIONAL ROAD 6 CRAIOVA-DROBETA
TURNU SEVERIN HUSNITA BRIDGE, KM 297+380 & DN6 BRIDGE, KM 282+540”-
Strehaia, Mehedinti District ; “Mc. Donald's Billa” 102-104 Barbu
Vacarescu str., Bucharest 2
LIFE
CONSTRUCTION, Craiova – 8/1/2006 to 12/7/2007- Consultant
& Quality Controller (CQ)
Quality
control of the works for the Site "Tuzla Residential Complex"-39
Tuzla Str., Bucharest
PAVEXIM
CONSTRUCT, Bucharest - 2006, June 21 to 2006,
June 28 - Quality Controller (CQ)
The
drawing up of the Quality Program for the Site "Planorama Residential Complex"-4
Tower houses -2 Basements+Ground Floor+15 Floors-118 Gherase str., Bucharest
PRODAC,
Bucharest-2006/6/15 to 2007/3/15 - Consultant & Quality Controller
(CQ) - Quality control of the works for the Sites : "Planorama
Residential Complex"-4 Tower houses -2 Basements+Ground Floor+15
Floors-118 Gherase str., Bucharest; “Bloc of Flats”-2 Basements+GF+6 floors, 29
Veronica Micle str., Bucharest & “Bloc of Flats”-2 Basements+GF+8 floors,
29 Invingatorilor str., Bucharest
FORETIS,
Bucharest-5/25/2006 to 9/23/2006-Managerial
Consultant & Quality Controller (CQ)-Quality control of the works for
the Sites "Mall Extension and Parking" and "Tuzla Residential
Complex" and the drawing up of the Handbook of the Quality of FORETIS
Company for the certification ISO 9001:2001 (10 tomes - 836 pages)
STEEL
BUILDING GROUP, Bucharest –
11/10/2005
to 09/24/2006 - Quality Controller (CQ)
Quality
control of the works and the drawing up of the Quality Program for the Site
"Offices Finans Bank & Anchor Group"-Office Building-Basement+Ground
Floor+12 Floors-Metallic Structure-26S Timisoara Bd., Bucharest-Beneficiary :
ANCHOR GROUP
H.G.A.
SERVIMPEX, Bucharest - 2005, October 6 to 2005,
November 16 - Quality Controller (CQ)
Quality
control of the works for the "Revision of the refinery" – Petromidia
Complex, Navodari, District of Constanta - Beneficiary : ROMPETROL
GRISTAR
CONSTRUCT, Bucharest – 2005/9/10 to 2005/11/18
- Quality Controller (CQ)
Quality
control of the works and the drawing up of the Quality Program for the Site "Housing
Basement+Ground floor+2 Floors" 83 Carol Knappe str., Bucharest
TREI PIETRE,
Bucharest - 2005/8/1 to 2006/5/31 - Quality
Controller (CQ) & Managerial Consultant
Quality
control of the works and the drawing up of the Quality Program for the Site
"Arrangement 2 Sports Grounds, swimming pool and Centre of Recovery"
- National Stadium “Lia Manoliu” - 37-39 Basarabia Blvd., Bucharest -
Beneficiary : ALEX COM 94 BUCHAREST and the drawing up of the Quality
Management System Documentation for the certification ISO 9001:2001 (6 parts -
550 pages)
FLOREA,
Bucharest - 2005, June 16 -
September 16 - Quality Controller (CQ)
Quality
control of the works on the Site "Housing Ground floor + 3
Floors" 9 Taciunelui str., Bucharest
GRIDEANU,
Bucharest - 2005, June 3 - October 1
- Quality Controller (CQ) - Quality control of the works on the Site
"Housing Semi-basement+Ground floor+1 Floor+1 Attic" 28 Putul
lui Craciun str., Bucharest
PAZARBAS
CONSTRUCTION, Bucharest
- 2005, May
16 - 2006, March 15 - Quality Controller (CQ)
Quality
control of the works and the drawing up of the Quality Program for the the Site
"Isuzu Showroom" – Ground floor+2 Floors - Ciolpani, District of
Ilfov - Beneficiary : ANADOLU AUTOMOBIL ROM
CONTRANS,
S.A., Bucharest - 2004, March 1 - 2004,
December 31 - Quality Controller (CQ)
Quality
control of the works on the Site "Consolidation, extension and
construction of a floor housing Semi-basement+Ground floor+2
Floors"-58 Paris str.,Bucharest
LEV OR IMPEX,
Bucharest-10/01/2003 -
present - Quality Controller (CQ)
& Managerial Consultant
Quality
control of the works and the drawing up of the Quality Programs for the site “House
Business Center Construct”-Offices,Shops,Warehouses– Semi-basement+Ground
floor+3 Floors–11A Calea Bucuresti,Otopeni District of Ilfov
(2003/10/1-2005/9/8), for the Site "Block of flats-2Semi-basement+Ground
floor+3 Floors"-41 Occidentului str., Bucharest(2005/4/25-present) &
the drawing up of the Lev Or Impex' Quality Management System Documentation for
the certification ISO 9001:2001 (6 tomes - 575 pages)
free time activities (iso managerial
consultancy)
FIDES,
Bucharest - 2008, May 27 to June 26
- Managerial Consultant - Drawing up of Company Quality Management
System Documentation for the ISO 9001:2001 certification (7 tomes - 501 pages)
ŐZER
CONSTRUCTION, Bucharest -
2008, April
17 to May 16
Managerial Consultant - Drawing up of Company Quality Management System
Documentation for the ISO 9001:2001 certification (7 tomes - 743 pages)
KINGDOM
CONSTRUCTII, Bucharest -
2008,
January 9 to January 25
Managerial Consultant - Drawing up of Company Quality Management System
Documentation for the ISO 9001:2001 certification (7 tomes - 740 pages)
HISPANO
CONSTRUCT, Bucharest - 2007, December 18 to
2008, January 17-Managerial Consultant - Drawing up of Company Quality
Management System Documentation for the SR EN ISO 9001:2001 Certification (10
tomes - 878 pages), the Environmental Management System Documentation for the
SR EN ISO 14001:2005 Certification (6 tomes - 308 pages) and the Occupational
Health & Safety Management System Documentation for the SR OHSAS 18001:2004
Certification (5 tomes - 153 pages) (General Total:21 tomes=1,339 pages)
V. CRISAN
& DUNEL CONSTRUCT, Bucharest - 2007, August 3 to 2007, August 12
Managerial Consultant - Drawing up of the Quality Program for the Site
“Bloc of Flats”-Basement+GF+4/5 floors, 35 Agricultori str., Bucharest and of
the Quality Management System Documentation for the V. Crisan & Dunel
Construct Company for the certification ISO 9001:2001 (7 tomes - 619 pages)
SOUTH PACIFIC
GROUP, Bucharest - 2006, September 29 to
2007, April 23 – Managerial Consultant - Drawing up of the Quality
Management System Documentation for the South Pacific Constructii Company for
the certification ISO 9001:2001 (7 tomes - 615 pages) & obtaining the ISO
9001:2001 Certification
V & S
CONSTRUCT 2002 GROUP, Bucharest - 2006, June 22 to July 6 - Managerial Consultant
Drawing
up of the Quality Management System Documentation for the V & S Construct
2002 Group Company for the certification ISO 9001:2001 (7 parts - 618 pages)
MAGICON,
Bucharest - 2005, December 7 to
2006, January 18 - Managerial Consultant - Drawing up of the
Quality Management System Documentation for the Magicon Company for the
certification ISO 9001:2001 (6 parts - 574 pages)
SUMMA ROMANIA
- 2005, October 26 to
2006, February 8 – Managerial Consultant - Drawing up of the Quality
Management System Documentation for the Summa Company for the certification ISO
9001:2001 (6 tomes - 580 pages)
OTHER free time activities
"SO.GA.M.EX"
(AGADIR’S IMPORT-EXPORT COMPANY), Agadir, MOROCCO-Technical and Marketing
Manager - 1992, May 25 - 1993, January 9 ; Task: Imports in Morocco from Guinea-Conakry
![]()
Skills
IT SKILLS: PC Operator Microsoft Windows 95, 98, 2000 Professional, NT Workstation, XP & Vista, Microsoft Word 97, 2000, 2003 & XP, Microsoft Excel 97, 2000, 2003 & XP, Power Point & Internet
OTHER SKILLS:
* experience in sales (construction materials, but also services)
* negotiation and customer oriented skills (especially of the contracts & prices of the construction materials and services);
* experience in international trade (imports in Morocco from Guinea-Conakry of fresh pineapple, fresh mango, coconuts and coffee & imports in Romania: construction equipments from France & construction materials from New Zealand)
* real estate field experience;
* management & leadership skills;
* advanced analytical ability coupled with clear and concise verbal and written communication skills
* ready to work 12-14 Hours/Day
* owner of a clean & valid driving license B Category since 1981(experienced in long travels)
Languages
Mother tongue Romanian
Very good (Fluent) French
Good English
Good German
EXTRA-PROFESSIONAL
Experience
▲"Motto: One cannot be
more credible than the group he belongs to." (http://www.biodyn.ro/web-eurosc/)
Social-cultural activities
* 5/15 - 1978/9/30-Traveller guide on the Black Sea Coast for German and Austrian tourists groups ;
*
1978/11/15 - 1979/3/15-Traveller guide at the Brasov Glade for German, Dutch
and Begian tourists groups ;
*
1997/02/27-to present Bucharest, ROMANIA; Position: Founder Member and Honorary
President of the Administration Council of the Humanitarian Foundation
"The Samaritain" (with a Branch in Fagaras City); Tasks: Financial
Assistance at the Building of the "St. Ilie" Church and at the
renovation of “Birth of God’s Mother” & “Holy Trinity” Churches, Bucharest
; Aid for the Caraiman Chidren’s Hospital – Bucharest, in co-operation with the
Humanitarian Association AMROLUX from Luxemburg; Aid for the Crèche No. 37, the
“St. Mary” Placement Centre, the Clinical Hospital of Obstetrics and
Gynaecology “Prof. Dr. Panait Sârbu”-Bucharest ; Financial Assistance for the
Romanian Centre for missing and sexual abused children “Focus”.
Ecological activities
MEMBERSHIP :
|
◙ National Geographic
Society (Washington, D.C.-U.S.A.) (8th
December 2005 - present) ; |
|
|
◙ International Society for Environmental Information Sciences (Regina, Saskatchewan-CANADA) (1st April 2006 - present) ; |
|
◙ Ecological Club UNESCO Pro Natura (Bucharest, ROMANIA) (27th March 2006 - present) ;
◙ Engineers for a Sustainable World (Nr. 1600) (Ithaca, NY-U.S.A.) (2006 - present) ;
|
◙ Eco-Ethics International Union (Oldendorf/Luhe-GERMANY) (13th April 2006 - present) ; |
|
◙ World Environmental Organization (Washington, D.C.-U.S.A.) (2006 - present) ;
◙ OneWorld
(London-U.K.) (13th August 2006 - present) ;
|
◙ Engineers Dedicated to a
Better Tomorrow (a.k.a., DedicatedEngineers) (7th February 2008 - present) ;. |
|
Technical-scientifical activities
▲ On the
27th January 2008 his Biography was published in the Biographical
Dictionary
▲ Awarding
on the 1st February 2008 of a Proclamation
Plaque as a “Great Mind of the 21st Century” and on the 14th May 2008 of a Great Minds of the 21st Century medal, by the American
Biographical Institute (A.B.I.), Raleigh,
Northern California, U.S.A.
MEMBERSHIP :
|
◙ General
Association of the Engineers in Romania (A.G.I.R.) (Nr. 60285)
(Bucharest-ROMANIA) (1st March 2006 - present) ; |
|
|
◙ National Registry of
Experts (N.R.E.) (Nr. 3743) (Bucharest-ROMANIA) (2006 - present) ; |
|
◙ Company of the Extra-judiciary Technical Experts and Consultants (Bucharest, ROMANIA) (8th March 2006 - present) ;
|
◙ British
Association for the Advancement of Science (London-U.K.) (12th March 2006 - present) ; |
|
|
◙ MBA GlobalNet (New York-U.S.A.) (12th March 2006 - present) ; |
|
|
◙ EUROSCIENCE, European Association for the Promotion of Science and Technology (Nr. 2538) (Strasbourg, FRANCE) (12th March 2006 - present) ; |
|
|
◙ League of Cultural and Scientific Co-operation Romania - France (Bucharest, ROMANIA) (16th March 2006 - present) ; |
|
|
◙ American Association for the Advancement of Science (Nr. 20187568) (Vienna, VA-U.S.A.) (18th March 2006 - present) ; |
|
|
◙ Internet Society (Geneva,
SWITZERLAND) (22nd March 2006 - present) ; |
|
|
◙ European Economic Association (Nr 3589) (Coventry-U.K.) (22nd March 2006 - present) ; |
|
◙ International
Webmasters Association (Nr.
273911) (Pasadena, CA-U.S.A.) (25th March 2006 - present) ;
|
◙ International Knowledge
Management Institute (Washington, D.C.-U.S.A.)
(2006 - present) ; |
|
|
◙ Bioinformatics Organization (Nr. 25980) (Hudson, MA-U.S.A.) (30th March 2006 - present) ; |
|
|
◙ The Academy of International Business (Nr. 31508) (East Lansing, MI-U.S.A.) (1st April 2006 - present) ; |
|
|
◙ Swiss Engineering UTS (Nr 104928) (Zürich & Lausanne, SWITZERLAND) (3rd April 2006 - present) ; |
|
|
◙ New York Academy of Sciences (Nr. 05064939) (New York, NY-U.S.A.) (20th June 2006 - present) ; |
|
|
◙ |
|
|
◙ Hawaii Academy of
Science (Honolulu, HI-U.S.A.) (2007 -
present) ; |
|
|
◙ The International Association for Conflict Management ( |
|
|
◙ Florida Academy of
Sciences (Orlando, FL-U.S.A.) (1st May
2007- present) ; |
|
|
◙ Fulbright Academy of Science & Technology
(Cape Elizabeth, Maine-U.S.A.) (21st January 2008 - present) ; |
|
|
◙ American Society for
Quality (No. 63679435) (Milwaukee, Wisconsin-U.S.A.) (24th January 2008 -
present) ; |
|
|
◙ World Future Society
(Bethesda, Maryland-U.S.A.) (24th January 2008 - present) ; |
|
|
◙ European Association for
the Study of Science and Technology (Guildford, Surrey-United Kingdom) (2008
- present). |
Hobbies
Webdesign, Internet, Reading, Science, Traveling, Ecology, Music, Movies, Swimming, Pictures, Chess, Bowling, Table tennis, Backgammon
Miscellaneous
* BIRTH DATE: the 26 of September 1957
* BIRTH PLACE: Bucharest
* NATIONALITY (Citizenship): Romanian
* MARITAL STATUS: Married with Dr. Mihaela Ramona ROMAN, Specialist Physician in Family Medicine
* CHILDREN: Isabela-Cristina ROMAN, born at 1984 May 9
Mihai Tiberiu ROMAN, born at 1987 April 10
* MILITARY OBLIGATIONS: Fulfilled (1976/1977)
* POLICE RECORD: No criminal record
* GENERAL HEALTH: Good condition
* TRIPS ABROAD: 1973 (Austria-1 week); 1974 (Hungary, Tchechoslovakia, Germany-2 weeks); 1975 (Hungary, Austria, Germany, France, Spain, Morocco-4 months); 1990/1992 (Morocco-3 years); 1993 (Hungary, Austria, Belgium, Netherlands, France, Luxembourg, Germany-8 months); 1996 (France, Canada : visitor of the International Exhibition "Construct Canada’96"-2 weeks); 1999 (Germany-1 week); 2000 (Germany-1 week); 2006 (Hungary, Austria, Germany, Netherlands, Belgium, France - 2 weeks) ; 2007 (Poland – 2 weeks).